U.S. Navy Pier 12
Location: San Diego, CA |
Project: U.S. Navy San Diego Pier 12 Replacement |
Product: StormStrong Pipe Piles
For this pier replacement project, CCG supplied 230 StromStrong piles, ranging from 61 to 66 feet long and 12 inches in diameter. The piles included a 20-foot long HDPE sleeve to help withstand abrasion from marine camels. In addition, some of the piles at the end of the pier were filled with concrete by the contractor, in order to give them added stiffness, as desired by the project owner.