Form Deck Installation at Historic Suspension Bridge
The form deck installation needs to:
- Support wet concrete dead load with minimal deflection
- Provide extended service life of the concrete and reinforcing bars by eliminating corrosion
- Maintain a visually appealing appearance to a historical landmark.
The Problem:
The historical Waco suspension bridge was rehabilitated in 1914. Due to corrosion of the deck, cable and anchors another extensive rehabilitation was needed. With constant moisture from the Brazos River below, the engineering team sought a form deck with high strength but light weight, corrosion resistant, and visually appealing for this historical landmark near downtown Waco, TX.
The Solution:
Offering superior strength and stiffness along with unsurpassed corrosion resistance Enduro TuffSpan form deck is ideally suited to provide a temporary form until concrete is fully cured and a permanent corrosion resistant barrier increasing the life span of the bridge in these conditions. The TuffSpan form deck utilizes premium vinyl ester resin and high tensile strength bi-directional glass reinforcement with the glass encompassing 50% of the panel weight. This results in a solution with excellent corrosion resistance, minimal deflection and long-term retention of structural properties.