Location: San Francisco, CA
Project: West Harbor Renovation, phase I (Dec. 2011)
Product: Pipe Piles
Overview: The San Francisco Marina was undergoing extensive renovation and repair in preparation for hosting the 2013 America’s Cup sailboat race. Creative Pultrusions supplied 12-inch diameter SUPERPILE fender piles to a local company, who drove the piles at the site. A total of 190 Superpiles will be installed at the completion of the project. The FRP piles were chosen for their longevity, energy absorption capabilities, and aesthetic attributes.